CONSTRUCTION COST CALCULATOR

Retail

Bulky Goods Retail (Exc Tenant Fitout) =
sqm

Bulky Goods (Small) EXCL HVAC, Sprinklers

Bulky Goods (Medium, ave 1715m2/Unit) EXCL HVAC, Sprinklers

Bulky Goods (Big Box Hardware Style - 2.1m precast & metal cladding above) INCL Sprinklers EXCL HVAC

Bulky Goods (Hi-end Hardware Style - Full height precast) INCL HVAC, Comms, Sprinklers

External Works

Heavy Duty Conc, Truck 175mm R conc paving
(Incl Earthwork, Stormwater Drainage, Kerbing & Lights)
sqm
Medium Duty Conc, Truck 150mm R conc paving
(Incl Earthwork, Stormwater Drainage, Kerbing & Lights)
sqm
Car Park paving, Asphalt (Incl Earthwork, Stormwater
Drainage, Kerbing & Lights) Total amount of parking space?
sqm

OR

Car Park paving, Asphalt (Incl Earthwork, Stormwater
Drainage, Kerbing & Lights) Number of park spaces?
num
MFB/CFA Access Track, 150mm Crushed Rock Track
(Incl Earthwork & Stormwater Drainage)
sqm

Options

Aust Std Sprinkler Protection  Excl. Tank/Pumps
Yes No

Sprinkler Tanks & Pumps (Incl water supply & BWIC)
Yes No

Passenger Lift including shaft and builders works
Yes No

Dock Levellers,  (Incl Recess dock, Rtg walls,
Armco rail, RSD, Dock leveller, EXCL Canopy)
Yes No num

Automatic Gates
Yes No

Boom gate, 4.50m boom arm c/w logic controller,
loop detector, limit switch & vehicle safety loop/detector
Yes No

Outdoor area (incl P conc screen wall, paving & sails shade)
sqm

Additional ESD Initiatives

Rainwater Harvesting Tank, 45,000 ltr above ground
(Incl mains back-up, retic. to toilets & irrigation).
Yes No

"Smart Lighting" management system incl zones
PE cells & PLC controls, 100% - 50% diagonal control pattern
sqm